You are here: Home > Sri Lanka
All posts from

cida.gov.lk Contractor Registration Sri Lanka : Construction Industry Development Authority

Organisation : Construction Industry Development Authority
Facility Name : Contractor Registration
Applicable Country : Sri Lanka
Website : https://www.cida.gov.lk/sea_con/pages_e.php?id=103

Sponsored Links:
Want to comment on this post?
Go to bottom of this page.

How To Apply For Contractor Registration in Sri Lanka?

Application forms and Guidelines are available for sale at our Information Center located at the ground floor of the Head Office. Duly filled applications with supporting documents are to be handed over to the information center for processing. On the submission of the applications and supporting documents a reference number will be issued to the customer.

Related / Similar Facility : CIDA Temporary Registration Certificate For Foreign Contractor Sri Lanka

Sponsored Links:

Normal processing period for higher grades (from C-6 and above) are 02 weeks and for lower grades 07 working days. Processing can be expedited by paying an additional fee. Amount of the additional fee depend on the Grade. For this purpose a copy of the tender notice is also to be submitted. Kindly note that in case of non submission of required supporting documents, may cause delays in processing.

Download Application Form Here : https://www.cida.gov.lk/sea_con/pages_e.php?id=7

Fields of Contractors

Fields 1 : Main Construction Contractors
** Building
** Highway
** Bridge
** Water Supply and Sewerage
** Irrigation and Drainage Canals
** Dredging and Reclamation
** Storm Water disposal and Land Drainage
** Maritime Construction
** Heavy Construction (Areas to be specified)

Fields 2 : Electrical & Mechanical Services
** Electrical Installation (Low Voltage) (EI-LV)
** Electrical Installation (Medium Voltage) (EI-MV)
** Elevators, Escalators and Travellators (EET)
** Extra Low Voltage Installation (Data, Telecommunication, Security Systems, Public Address Systems, Pipe Music (ELV)
** Fire Detection, Protection and Suppression (FDPS)
** Generators (Gen)
** Heavy Steel Fabrications (HSF)
** LP Gas Systems (LPG)
** Mechanical Ventilation and Air Conditioning (MVAC)
** Medical Gas Systems
** Plumbing and Drainage (PD)
** Refrigeration (RF)

Fields 3 : Specialty
Finishing Trades (FT)
** Carpentry & Joinery (Carp)
** Floor, Wall & Ceiling Finishes (FW&C) [must specify the finish]
** Furniture, Fittings & Equipment (FF&E)
** Landscaping (LA)
** Light Metal Work (ME)

Other Specialized Trades:
** Aluminium & Finishes (A&F)
** Soil Nailing & Stabilization (SN)
** Swimming Pools (SP) (Industrial & Domestics)
** Water Proofing (WP)

Submit your application:
Once you have gathered all of the required documents, you can submit your application to the CIDA Information Center. The processing fee for the application will vary depending on the grade you are applying for.

Wait for a decision:
The CIDA will review your application and supporting documents. If everything is in order, you will be issued with a contractor registration certificate. The processing time for applications is typically 2 weeks for higher grades (C-6 and above) and 7 working days for lower grades.

Leave a Reply